DETAILS OF CONSULTANCY ASSIGNMENTS /OFFERS COMPLETED (UPTO
Dec, 2007)
| Name
of Agency seeking consultancy from SJVNL |
CEA,
MOP |
| Scope
of work |
Preparation
of Pre-feasibility Reports (PFR) for Khab-I &
Khab-II HEP on river Satluj basin. |
| Date
of request for consultancy |
May,
2003 |
| Cost
of consultancy Assignment |
Rs.
28.77 lac |
|
Date of completion |
March/April 2004 |
| Remarks |
PFRs of these projects were prepared as per
guidelines issued by CEA/CWC. Estimates for the
above projects were made on the basis of "CEA
Guidelines for preparation of Cost Estimates
of PFR of Hydroelectric Projects". |
| Name
of Agency seeking consultancy from SJVNL |
M/s Bobba Power Projects (P) Ltd. Banglore.
|
| Scope
of work |
To examine techno-economic viability of Hydel scheme
namely;
Mulibetu (10.5MW)- located in Karnatka. |
| Date
of request for consultancy |
Oct, 2003 |
|
Date of completion |
Dec, 2003 Lac |
| Cost
of consultancy Assignment |
Rs. 0.38 Lac |
| Remarks |
The consultancy job includes review of DPRs with
regard to hydrology, power generation, layout of
projects, design of components, cost estimates etc.
This consultancy assignment was completed in by
experts of SJVNL in 2 months. |
| Name
of Agency seeking consultancy from SJVNL |
M/s Mount Kailash Power Projects (P) Ltd. Bangalore.
|
| Scope
of work |
To examine techno-economic
viability of Hydel scheme namely; Mannapitlu(15MW) -
located in Karnatka. |
| Date
of request for consultancy |
Oct, 2003 |
|
Date of completion |
Dec, 2003 |
| Cost
of consultancy Assignment |
Rs. 0.38 Lac |
| Remarks |
The consultancy job includes review of DPRs with
regard to hydrology, power generation, layout of
projects, design of components, cost estimates etc.
This consultancy assignment was completed in by
experts of SJVNL in 2 months. |
| Name
of Agency seeking consultancy from SJVNL |
Konkan Railway Corporation Ltd., Mumbai (KRCL)
KRCL is engaged in construction of 90 Km section of
single broad gauge railway line between
Katra-Laole-Udhampur-Srinagar-Baramula rail link
project in J&K. |
| Scope
of work |
a) To impart training and know-how in preparation
and supply of construction drawings of approach
cuttings and portals of tunnels in different kinds
of strata. |
|
b) To impart training and know-how in preparation
and supply of construction drawings for excavation
and support system including but not limited to
design of steel ribs after load calculations, rock
bolts, shotcreting with or without wiremesh/steel
fibres, fabrication drawings of steel ribs for
tunnels in different type of strata. |
|
c) To assist KRCL engineers in study of slope
stability of deep cuttings, its analysis and design
and support requirements wherever required. |
|
d) To assist KRCL engineers in designing and
making/supply drawings for water channelizing in and
outside the tunnel, consolidation grouting or any
special methods required for rock/soil
stabilization, tunneling. |
| Date
of request for consultancy |
Nov., 2003 |
|
Date of completion |
March, 2006 |
| Cost
of consultancy Assignment |
RS. 47.13 Lac |
| Remarks |
The assignment was successfully completed in March,
2006 to the satisfaction of KRCL. |
|
|