SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 01.04.10 is 36123.468 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 01.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.338

11.739

10.679

10.616

9.338

11.739

10.679

10.616

9.338

11.739

10.679

10.616

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.025

1.019

4:56

0:00:00

0:00:00

0:00

19:04

0:00:00

24:00

Unit - 2 

3.520

3.501

15:33

0:00:00

0:00:00

0:00

8:27

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 4 

0.430

0.429

2:00

0:00:00

0:00:00

0:00

22:00

0:00:00

24:30

Unit - 5 

2.928

2.904

12:53

0:00:00

0:00:00

0:00

11:07

0:00:00

24:00

Unit - 6 

2.776

2.763

12:19

0:00:00

0:00:00

0:00

11:41

0:00:00

24:00

 

Total

10.679

10.616

47:41

0:00:00

0:00:00

0:00

96:19

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

111

Max. Dam Level

1493.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1477.45

Wangtoo

439

7:00

386

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

121

1:00

87

10:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

4

0

Draft Tube

0

0