SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 01.04.10 is 36123.468 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 01.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
9.338 |
11.739 |
10.679 |
10.616 |
9.338 |
11.739 |
10.679 |
10.616 |
9.338 |
11.739 |
10.679 |
10.616 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
1.025 |
1.019 |
4:56 |
0:00:00 |
0:00:00 |
0:00 |
19:04 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
3.520 |
3.501 |
15:33 |
0:00:00 |
0:00:00 |
0:00 |
8:27 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
0.430 |
0.429 |
2:00 |
0:00:00 |
0:00:00 |
0:00 |
22:00 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
2.928 |
2.904 |
12:53 |
0:00:00 |
0:00:00 |
0:00 |
11:07 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.776 |
2.763 |
12:19 |
0:00:00 |
0:00:00 |
0:00 |
11:41 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
10.679 |
10.616 |
47:41 |
0:00:00 |
0:00:00 |
0:00 |
96:19 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
111 |
Max. Dam Level |
1493.15 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
76 |
Min. Dam Level |
1477.45 |
Wangtoo |
439 |
7:00 |
386 |
19:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
121 |
1:00 |
87 |
10:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
4 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||