SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 02.04.10 is 36133.440 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 02.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.338

10.534

9.972

9.895

18.676

22.273

20.651

20.511

18.676

22.273

20.651

20.511

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.765

0.758

3:11

0:00:00

0:00:00

0:00

20:49

0:00:00

24:00

Unit - 2 

0.436

0.432

2:09

0:00:00

0:00:00

0:00

21:51

0:00:00

24:00

Unit - 3 

0.669

0.661

2:44

0:00:00

0:00:00

0:00

21:16

0:00:00

24:00

Unit - 4 

2.540

2.535

10:25

0:00:00

0:00:00

0:00

13:35

0:00:00

24:30

Unit - 5 

4.201

4.154

18:31

0:00:00

0:00:00

0:00

5:29

0:00:00

24:00

Unit - 6 

1.361

1.355

5:46

0:00:00

0:00:00

0:00

18:14

0:00:00

24:00

 

Total

9.972

9.895

42:46

0:00:00

0:00:00

0:00

101:14

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

105

Max. Dam Level

1494.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

105

Min. Dam Level

1477.20

Wangtoo

417

13:00

330

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

371

24:00

89

11:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

891

0

Draft Tube

2

0