SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 03.04.10 is 36142.906 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 03.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
9.338 |
9.371 |
9.466 |
9.405 |
28.014 |
31.644 |
30.117 |
29.916 |
28.014 |
31.644 |
30.117 |
29.916 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
1.874 |
1.855 |
7:31 |
0:00:00 |
0:00:00 |
0:00 |
16:29 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
2.988 |
2.977 |
11:57 |
0:00:00 |
0:00:00 |
0:00 |
12:03 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
2.419 |
2.396 |
9:45 |
0:00:00 |
0:00:00 |
0:00 |
14:15 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.185 |
2.177 |
8:49 |
0:00:00 |
0:00:00 |
0:00 |
15:11 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
9.466 |
9.405 |
38:02 |
0:00:00 |
0:00:00 |
0:00 |
105:58 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
102 |
Max. Dam Level |
1492.80 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
99 |
Min. Dam Level |
1476.65 |
Wangtoo |
424 |
1:00 |
359 |
7:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
432 |
1:00 |
78 |
20:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
45 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||