SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 04.04.10 is 36151.401 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 04.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.338

8.416

8.495

8.415

37.352

40.060

38.612

38.331

37.352

40.060

38.612

38.331

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 2 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 3 

1.942

1.911

8:54

0:00:00

0:00:00

0:00

15:06

0:00:00

24:00

Unit - 4 

1.803

1.795

7:29

0:00:00

0:00:00

0:00

16:31

0:00:00

24:30

Unit - 5 

1.717

1.691

7:56

0:00:00

0:00:00

0:00

16:04

0:00:00

24:00

Unit - 6 

3.033

3.018

13:27

0:00:00

0:00:00

0:00

10:33

0:00:00

24:00

 

Total

8.495

8.415

37:46

0:00:00

0:00:00

0:00

106:14

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

102

Max. Dam Level

1494.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

88

Min. Dam Level

1476.85

Wangtoo

408

13:00

356

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

118

2:00

83

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

51

0

Draft Tube

0

0