SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 04.04.10 is 36151.401 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 04.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
9.338 |
8.416 |
8.495 |
8.415 |
37.352 |
40.060 |
38.612 |
38.331 |
37.352 |
40.060 |
38.612 |
38.331 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
1.942 |
1.911 |
8:54 |
0:00:00 |
0:00:00 |
0:00 |
15:06 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
1.803 |
1.795 |
7:29 |
0:00:00 |
0:00:00 |
0:00 |
16:31 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
1.717 |
1.691 |
7:56 |
0:00:00 |
0:00:00 |
0:00 |
16:04 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
3.033 |
3.018 |
13:27 |
0:00:00 |
0:00:00 |
0:00 |
10:33 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
8.495 |
8.415 |
37:46 |
0:00:00 |
0:00:00 |
0:00 |
106:14 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
102 |
Max. Dam Level |
1494.70 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
88 |
Min. Dam Level |
1476.85 |
Wangtoo |
408 |
13:00 |
356 |
19:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
118 |
2:00 |
83 |
21:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
51 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||