SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 05.04.10 is 36161.161 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 05.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.338

8.995

9.760

9.699

46.690

49.055

48.372

48.030

46.690

49.055

48.372

48.030

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 2 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 3 

0.876

0.871

3:48

0:00:00

0:00:00

0:00

20:12

0:00:00

24:00

Unit - 4 

2.864

2.849

11:53

0:00:00

0:00:00

0:00

12:07

0:00:00

24:30

Unit - 5 

3.572

3.543

14:39

0:00:00

0:00:00

0:00

9:21

0:00:00

24:00

Unit - 6 

2.448

2.436

10:15

0:00:00

0:00:00

0:00

13:45

0:00:00

24:00

 

Total

9.760

9.699

40:35

0:00:00

0:00:00

0:00

103:25

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

101

Max. Dam Level

1495.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

102

Min. Dam Level

1476.85

Wangtoo

393

1:00

344

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

218

9:00

81

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

1

0