NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 06.04.10 is 36171.091 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 06.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.338

8.989

9.930

9.870

56.028

58.044

58.302

57.900

56.028

58.044

58.302

57.900

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.369

0.366

1:44

0:00:00

0:00:00

0:00

22:16

0:00:00

24:00

Unit - 2 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 3 

0.692

0.688

3:11

0:00:00

0:00:00

0:00

20:49

0:00:00

24:00

Unit - 4 

3.046

3.036

12:22

0:00:00

0:00:00

0:00

11:38

0:00:00

24:30

Unit - 5 

3.660

3.630

15:10

0:00:00

0:00:00

0:00

8:50

0:00:00

24:00

Unit - 6 

2.163

2.150

9:10

0:00:00

0:00:00

0:00

14:50

0:00:00

24:00

 

Total

9.930

9.870

41:37

0:00:00

0:00:00

0:00

102:23

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

101

Max. Dam Level

1494.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

103

Min. Dam Level

1478.05

Wangtoo

371

13:00

328

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

176

13:00

60

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0