SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 06.04.10 is 36171.091 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 06.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
9.338 |
8.989 |
9.930 |
9.870 |
56.028 |
58.044 |
58.302 |
57.900 |
56.028 |
58.044 |
58.302 |
57.900 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
0.369 |
0.366 |
1:44 |
0:00:00 |
0:00:00 |
0:00 |
22:16 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.692 |
0.688 |
3:11 |
0:00:00 |
0:00:00 |
0:00 |
20:49 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
3.046 |
3.036 |
12:22 |
0:00:00 |
0:00:00 |
0:00 |
11:38 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
3.660 |
3.630 |
15:10 |
0:00:00 |
0:00:00 |
0:00 |
8:50 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.163 |
2.150 |
9:10 |
0:00:00 |
0:00:00 |
0:00 |
14:50 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
9.930 |
9.870 |
41:37 |
0:00:00 |
0:00:00 |
0:00 |
102:23 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
101 |
Max. Dam Level |
1494.85 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
103 |
Min. Dam Level |
1478.05 |
Wangtoo |
371 |
13:00 |
328 |
19:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
176 |
13:00 |
60 |
21:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||