SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 09.04.10 is 36203.614 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 09.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

9.255

9.886

11.576

11.503

83.295

87.894

90.825

90.195

83.295

87.894

90.825

90.195

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.418

0.414

1:40

0:00:00

0:00:00

0:00

22:20

0:00:00

24:00

Unit - 2 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 3 

1.838

1.817

7:54

0:00:00

0:00:00

0:00

16:06

0:00:00

24:00

Unit - 4 

2.772

2.763

11:57

0:00:00

0:00:00

0:00

12:03

0:00:00

24:30

Unit - 5 

1.824

1.808

7:56

0:00:00

0:00:00

0:00

16:04

0:00:00

24:00

Unit - 6 

4.724

4.701

19:47

0:00:00

0:00:00

0:00

4:13

0:00:00

24:00

 

Total

11.576

11.503

49:14

0:00:00

0:00:00

0:00

94:46

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

125

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

121

Min. Dam Level

1479.80

Wangtoo

400

13:00

357

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

149

20:00

93

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

7

0

Draft Tube

3

0