SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 11.04.10 is 36230.424 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 11.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
11.387 |
15.442 |
13.773 |
13.649 |
103.937 |
115.836 |
117.635 |
116.778 |
103.937 |
115.836 |
117.635 |
116.778 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
2.070 |
2.052 |
10:01 |
0:00:00 |
0:00:00 |
0:00 |
13:59 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
2.866 |
2.844 |
12:21 |
0:00:00 |
0:00:00 |
0:00 |
11:39 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
2.569 |
2.543 |
12:49 |
0:00:00 |
0:00:00 |
0:00 |
11:11 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
1.288 |
1.282 |
5:16 |
0:00:00 |
0:00:00 |
0:00 |
18:44 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
2.910 |
2.877 |
12:26 |
0:00:00 |
0:00:00 |
0:00 |
11:34 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.070 |
2.051 |
10:21 |
0:00:00 |
0:00:00 |
0:00 |
13:39 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
13.773 |
13.649 |
63:14 |
0:00:00 |
0:00:00 |
0:00 |
80:46 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
147 |
Max. Dam Level |
1495.00 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
143 |
Min. Dam Level |
1477.55 |
Wangtoo |
472 |
7:00 |
390 |
1:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
168 |
23:00 |
77 |
9:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
12 |
0 | |||||||||||||||
|
Draft Tube |
2 |
0 | |||||||||||||||