SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 12.04.10 is 36246.133 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 12.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

15.703

15.709

15.551

115.324

131.539

133.344

132.329

115.324

131.539

133.344

132.329

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.904

1.883

8:03

0:00:00

0:00:00

0:00

15:57

0:00:00

24:00

Unit - 2 

4.138

4.095

17:44

0:00:00

0:00:00

0:00

6:16

0:00:00

24:00

Unit - 3 

2.871

2.839

11:25

0:00:00

0:00:00

0:00

12:35

0:00:00

24:00

Unit - 4 

1.296

1.290

5:06

0:00:00

0:00:00

0:00

18:54

0:00:00

24:30

Unit - 5 

4.755

4.702

20:36

0:00:00

0:00:00

0:00

3:24

0:00:00

24:00

Unit - 6 

0.745

0.742

3:25

0:00:00

0:00:00

0:00

20:35

0:00:00

24:00

 

Total

15.709

15.551

66:19

0:00:00

0:00:00

0:00

77:41

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

154

Max. Dam Level

1495.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

164

Min. Dam Level

1478.70

Wangtoo

430

13:00

361

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

152

2:00

102

17:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

5

0

Draft Tube

2

0