SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 16.04.10 is 36299.381 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 16.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

13.299

13.735

13.627

160.872

183.871

186.592

185.126

160.872

183.871

186.592

185.126

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.538

0.533

2:13

0:00:00

0:00:00

0:00

21:47

0:00:00

24:00

Unit - 2 

2.725

2.702

11:23

0:00:00

0:00:00

0:00

12:37

0:00:00

24:00

Unit - 3 

1.527

1.511

5:59

0:00:00

0:00:00

0:00

18:01

0:00:00

24:00

Unit - 4 

1.658

1.653

6:43

0:00:00

0:00:00

0:00

17:17

0:00:00

24:30

Unit - 5 

3.965

3.918

16:11

0:00:00

0:00:00

0:00

7:49

0:00:00

24:00

Unit - 6 

3.322

3.310

13:21

0:00:00

0:00:00

0:00

10:39

0:00:00

24:00

 

Total

13.735

13.627

55:50

0:00:00

0:00:00

0:00

88:10

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

152

Max. Dam Level

1495.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

143

Min. Dam Level

1477.00

Wangtoo

424

13:00

394

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

178

12:00

71

16:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

39

0

Draft Tube

5

1