SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 17.04.10 is 36315.670 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 17.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
11.387 |
15.363 |
16.289 |
16.154 |
172.259 |
199.234 |
202.881 |
201.280 |
172.259 |
199.234 |
202.881 |
201.280 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
1.617 |
1.593 |
7:02 |
0:00:00 |
0:00:00 |
0:00 |
16:58 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
4.060 |
4.033 |
16:55 |
0:00:00 |
0:00:00 |
0:00 |
7:05 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
1.625 |
1.603 |
6:46 |
0:00:00 |
0:00:00 |
0:00 |
17:14 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
2.316 |
2.308 |
9:29 |
0:00:00 |
0:00:00 |
0:00 |
14:31 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
3.815 |
3.779 |
15:32 |
0:00:00 |
0:00:00 |
0:00 |
8:28 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.856 |
2.838 |
12:08 |
0:00:00 |
0:00:00 |
0:00 |
11:52 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
16.289 |
16.154 |
67:52 |
0:00:00 |
0:00:00 |
0:00 |
76:08 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
175 |
Max. Dam Level |
1493.10 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
170 |
Min. Dam Level |
1481.05 |
Wangtoo |
441 |
19:00 |
400 |
1:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
126 |
12:00 |
92 |
16:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
5 |
0 | |||||||||||||||
|
Draft Tube |
3 |
0 | |||||||||||||||