SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 17.04.10 is 36315.670 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 17.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

15.363

16.289

16.154

172.259

199.234

202.881

201.280

172.259

199.234

202.881

201.280

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.617

1.593

7:02

0:00:00

0:00:00

0:00

16:58

0:00:00

24:00

Unit - 2 

4.060

4.033

16:55

0:00:00

0:00:00

0:00

7:05

0:00:00

24:00

Unit - 3 

1.625

1.603

6:46

0:00:00

0:00:00

0:00

17:14

0:00:00

24:00

Unit - 4 

2.316

2.308

9:29

0:00:00

0:00:00

0:00

14:31

0:00:00

24:30

Unit - 5 

3.815

3.779

15:32

0:00:00

0:00:00

0:00

8:28

0:00:00

24:00

Unit - 6 

2.856

2.838

12:08

0:00:00

0:00:00

0:00

11:52

0:00:00

24:00

 

Total

16.289

16.154

67:52

0:00:00

0:00:00

0:00

76:08

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

175

Max. Dam Level

1493.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

170

Min. Dam Level

1481.05

Wangtoo

441

19:00

400

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

126

12:00

92

16:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

5

0

Draft Tube

3

0