SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 18.04.10 is 36333.670 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 18.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

19.008

18.000

17.891

183.646

218.242

220.881

219.171

183.646

218.242

220.881

219.171

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.472

1.464

6:06

0:00:00

0:00:00

0:00

17:54

0:00:00

24:00

Unit - 2 

3.834

3.814

16:32

0:00:00

0:00:00

0:00

7:28

0:00:00

24:00

Unit - 3 

4.365

4.331

18:17

0:00:00

0:00:00

0:00

5:43

0:00:00

24:00

Unit - 4 

2.160

2.153

9:16

0:00:00

0:00:00

0:00

14:44

0:00:00

24:30

Unit - 5 

3.111

3.084

14:17

0:00:00

0:00:00

0:00

9:43

0:00:00

24:00

Unit - 6 

3.058

3.045

12:26

0:00:00

0:00:00

0:00

11:34

0:00:00

24:00

 

Total

18.000

17.891

76:54

0:00:00

0:00:00

0:00

67:06

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

189

Max. Dam Level

1494.90

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

188

Min. Dam Level

1481.70

Wangtoo

527

19:00

414

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

148

12:00

96

16:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

2

0