SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 19.04.10 is 36352.715 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 19.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

18.726

19.045

18.871

195.033

236.968

239.926

238.042

195.033

236.968

239.926

238.042

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

3.257

3.221

13:22

0:00:00

0:00:00

0:00

10:38

0:00:00

24:00

Unit - 2 

4.417

4.374

18:10

0:00:00

0:00:00

0:00

5:50

0:00:00

24:00

Unit - 3 

4.238

4.193

17:20

0:00:00

0:00:00

0:00

6:40

0:00:00

24:00

Unit - 4 

2.990

2.986

11:51

0:00:00

0:00:00

0:00

12:09

0:00:00

24:30

Unit - 5 

3.364

3.326

13:40

0:00:00

0:00:00

0:00

10:20

0:00:00

24:00

Unit - 6 

0.779

0.771

3:38

0:00:00

0:00:00

0:00

20:22

0:00:00

24:00

 

Total

19.045

18.871

78:01

0:00:00

0:00:00

0:00

65:59

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

193

Max. Dam Level

1495.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

198

Min. Dam Level

1480.10

Wangtoo

574

19:00

511

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

196

6:00

112

4:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

7

0

Draft Tube

5

0