SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 19.04.10 is 36352.715 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 19.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
11.387 |
18.726 |
19.045 |
18.871 |
195.033 |
236.968 |
239.926 |
238.042 |
195.033 |
236.968 |
239.926 |
238.042 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
3.257 |
3.221 |
13:22 |
0:00:00 |
0:00:00 |
0:00 |
10:38 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
4.417 |
4.374 |
18:10 |
0:00:00 |
0:00:00 |
0:00 |
5:50 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
4.238 |
4.193 |
17:20 |
0:00:00 |
0:00:00 |
0:00 |
6:40 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
2.990 |
2.986 |
11:51 |
0:00:00 |
0:00:00 |
0:00 |
12:09 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
3.364 |
3.326 |
13:40 |
0:00:00 |
0:00:00 |
0:00 |
10:20 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
0.779 |
0.771 |
3:38 |
0:00:00 |
0:00:00 |
0:00 |
20:22 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
19.045 |
18.871 |
78:01 |
0:00:00 |
0:00:00 |
0:00 |
65:59 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
193 |
Max. Dam Level |
1495.35 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
198 |
Min. Dam Level |
1480.10 |
Wangtoo |
574 |
19:00 |
511 |
7:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
196 |
6:00 |
112 |
4:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
7 |
0 | |||||||||||||||
|
Draft Tube |
5 |
0 | |||||||||||||||