SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 20.04.10 is 36371.296 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 20.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

11.387

17.954

18.581

18.419

206.420

254.922

258.507

256.461

206.420

254.922

258.507

256.461

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

5.684

5.633

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

4.363

3.334

18:34

0:00:00

0:00:00

0:00

5:26

0:00:00

24:00

Unit - 3 

4.420

4.367

18:31

0:00:00

0:00:00

0:00

5:29

0:00:00

24:00

Unit - 4 

3.346

3.329

13:48

0:00:00

0:00:00

0:00

10:12

0:00:00

24:30

Unit - 5 

0.768

0.756

3:19

0:00:00

0:00:00

0:00

20:41

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

18.581

18.419

78:12

0:00:00

0:00:00

0:00

65:48

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

204

Max. Dam Level

1495.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

194

Min. Dam Level

1476.75

Wangtoo

1213

13:00

597

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

573

10:00

131

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

375

0

Draft Tube

16

0