SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 21.04.10 is 36391.455 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 21.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.661

18.591

20.159

19.984

221.081

273.513

278.666

276.445

221.081

273.513

278.666

276.445

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

5.203

5.145

21:22

0:00:00

0:00:00

0:00

2:38

0:00:00

24:00

Unit - 2 

4.565

4.527

18:29

0:00:00

0:00:00

0:00

5:31

0:00:00

24:00

Unit - 3 

4.268

4.227

17:16

0:00:00

0:00:00

0:00

6:44

0:00:00

24:00

Unit - 4 

4.023

4.001

16:41

0:00:00

0:00:00

0:00

7:19

0:00:00

24:30

Unit - 5 

2.100

2.084

8:38

0:00:00

0:00:00

0:00

15:22

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

20.159

19.984

82:26

0:00:00

0:00:00

0:00

61:34

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

219

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

210

Min. Dam Level

1481.00

Wangtoo

1651

19:00

794

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

901

23:00

455

1:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

18

0

Draft Tube

8

2