SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 23.04.10 is 29472.485 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 23.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.661

17.619

17.809

17.651

250.403

310.603

316.545

313.993

250.403

310.603

316.545

313.993

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

3.570

3.536

14:14

0:00:00

0:00:00

0:00

9:46

0:00:00

24:00

Unit - 2 

5.098

5.053

20:13

0:00:00

0:00:00

0:00

3:47

0:00:00

24:00

Unit - 3 

4.259

4.214

16:35

0:00:00

0:00:00

0:00

7:25

0:00:00

24:00

Unit - 4 

4.527

4.498

18:03

0:00:00

0:00:00

0:00

5:57

0:00:00

24:30

Unit - 5 

0.353

0.349

1:28

0:00:00

0:00:00

0:00

22:32

0:00:00

24:00

Unit - 6 

0.002

0.001

0:01

0:00:00

8:00:00

0:00

23:59

0:00:00

24:00

 

Total

17.809

17.651

70:34

0:00:00

8:00:00

0:00

73:26

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

189

Max. Dam Level

1489.60

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

186

Min. Dam Level

1476.90

Wangtoo

1503

7:00

1235

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

2495

13:00

442

23:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

235

4

Draft Tube

58

0