SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.04.10 is 29489.113 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 24.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

17.784

16.628

16.476

265.652

328.387

333.173

330.469

265.652

328.387

333.173

330.469

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

4.900

4.846

20:25

0:00:00

0:00:00

0:00

3:35

0:00:00

24:00

Unit - 2 

5.141

5.100

20:43

0:00:00

0:00:00

0:00

3:17

0:00:00

24:00

Unit - 3 

3.616

3.577

14:03

0:00:00

0:00:00

0:00

9:57

0:00:00

24:00

Unit - 4 

2.962

2.945

11:59

0:00:00

0:00:00

0:00

12:01

0:00:00

24:30

Unit - 5 

0.009

0.008

0:12

0:00:00

4:05:00

0:00

23:48

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

 

Total

16.628

16.476

67:22

0:00:00

28:05:00

0:00

76:38

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

182

Max. Dam Level

1491.90

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

173

Min. Dam Level

1476.75

Wangtoo

1002

1:00

542

21:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

511

5:00

249

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

22

5

Draft Tube

17

0