SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 25.04.10 is 29504.288 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 25.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

15.997

15.175

15.066

280.315

344.384

348.348

345.535

280.315

344.384

348.348

345.535

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

4.454

4.416

19:38

0:00:00

0:00:00

0:00

4:22

0:00:00

24:00

Unit - 2 

3.676

3.655

16:47

0:00:00

0:00:00

0:00

7:13

0:00:00

24:00

Unit - 3 

2.956

2.927

12:24

0:00:00

0:00:00

0:00

11:36

0:00:00

24:00

Unit - 4 

2.897

2.882

12:14

0:00:00

0:00:00

0:00

11:46

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

1.192

1.186

4:44

0:00:00

19:16:00

0:00

19:16

0:00:00

24:00

 

Total

15.175

15.066

65:47

0:00:00

43:16:00

0:00

78:13

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

164

Max. Dam Level

1492.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

158

Min. Dam Level

1476.85

Wangtoo

713

1:00

551

21:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

381

16:00

199

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

44

4

Draft Tube

5

2