SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 26.04.10 is 29519.470 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 26.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

14.951

15.182

15.035

294.978

359.335

363.530

360.570

294.978

359.335

363.530

360.570

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

4.361

4.315

17:47

0:00:00

0:00:00

0:00

6:13

0:00:00

24:00

Unit - 2 

2.736

2.707

11:02

0:00:00

0:00:00

0:00

12:58

0:00:00

24:00

Unit - 3 

4.787

4.737

19:16

0:00:00

0:00:00

0:00

4:44

0:00:00

24:00

Unit - 4 

0.554

0.551

2:18

0:00:00

0:00:00

0:00

21:42

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

2.744

2.725

11:07

0:00:00

0:00:00

0:00

12:53

0:00:00

24:00

 

Total

15.182

15.035

61:30

0:00:00

24:00:00

0:00

82:30

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

163

Max. Dam Level

1492.30

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

158

Min. Dam Level

1477.95

Wangtoo

629

1:00

354

21:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

229

24:00

169

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

27

0

Draft Tube

4

1