NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 27.04.10 is 29534.642 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 27.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

14.476

15.172

15.050

309.641

373.811

378.702

375.620

309.641

373.811

378.702

375.620

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.340

5.292

22:15

0:00:00

0:00:00

0:00

1:45

0:00:00

24:00

Unit - 2 

2.895

2.875

12:28

0:00:00

0:00:00

0:00

11:32

0:00:00

24:00

Unit - 3 

3.082

3.054

12:30

0:00:00

0:00:00

0:00

11:30

0:00:00

24:00

Unit - 4 

0.459

0.456

1:52

0:00:00

0:00:00

0:00

22:08

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

3.396

3.373

14:05

0:00:00

0:00:00

0:00

9:55

0:00:00

24:00

 

Total

15.172

15.050

63:10

0:00:00

24:00:00

0:00

80:50

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

171

Max. Dam Level

1495.30

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

158

Min. Dam Level

1480.40

Wangtoo

490

17:00

383

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

371

22:00

124

11:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

15

2

Draft Tube

3