SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 28.04.10 is 29553.412 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 28.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

17.266

18.770

18.606

324.304

391.077

397.472

394.226

324.304

391.077

397.472

394.226

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

4.637

4.599

18:56

0:00:00

0:00:00

0:00

5:04

0:00:00

24:00

Unit - 2 

3.861

3.832

16:24

0:00:00

0:00:00

0:00

7:36

0:00:00

24:00

Unit - 3 

4.083

4.041

16:57

0:00:00

0:00:00

0:00

7:03

0:00:00

24:00

Unit - 4 

3.610

3.582

14:29

0:00:00

0:00:00

0:00

9:31

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

2.579

2.552

10:43

0:00:00

0:00:00

0:00

13:17

0:00:00

24:00

 

Total

18.770

18.606

77:29

0:00:00

24:00:00

0:00

66:31

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

196

Max. Dam Level

1495.30

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

196

Min. Dam Level

1483.70

Wangtoo

2617

9:00

427

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1701

16:00

263

2:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

6

0

Draft Tube

3

0