SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 29.04.10 is 29573.792 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 29.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
14.663 |
20.486 |
20.380 |
20.217 |
338.967 |
411.563 |
417.852 |
414.443 |
338.967 |
411.563 |
417.852 |
414.443 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
4.115 |
4.071 |
17:11 |
0:00:00 |
0:00:00 |
0:00 |
6:49 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
4.447 |
4.410 |
18:08 |
0:00:00 |
0:00:00 |
0:00 |
5:52 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
3.950 |
3.915 |
16:39 |
0:00:00 |
0:00:00 |
0:00 |
7:21 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
4.198 |
4.175 |
16:56 |
0:00:00 |
0:00:00 |
0:00 |
7:04 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
0.000 |
0.000 |
0:00 |
0:00:00 |
24:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
3.670 |
3.646 |
15:45 |
0:00:00 |
0:00:00 |
0:00 |
8:15 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
20.380 |
20.217 |
84:39 |
0:00:00 |
24:00:00 |
0:00 |
59:21 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
213 |
Max. Dam Level |
1495.10 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
212 |
Min. Dam Level |
1484.90 |
Wangtoo |
992 |
5:00 |
763 |
17:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
654 |
2:00 |
285 |
9:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
6 |
0 | |||||||||||||||
|
Draft Tube |
5 |
0 | |||||||||||||||