SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 30.04.10 is 29597.398 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 30.04.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

14.663

22.750

23.606

23.397

353.630

434.313

441.458

437.840

353.630

434.313

441.458

437.840

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.274

5.226

21:25

0:00:00

0:00:00

0:00

2:35

0:00:00

24:00

Unit - 2 

5.612

5.560

22:37

0:00:00

0:00:00

0:00

1:23

0:00:00

24:00

Unit - 3 

4.123

4.075

16:42

0:00:00

0:00:00

0:00

7:18

0:00:00

24:00

Unit - 4 

4.641

4.597

18:15

0:00:00

0:00:00

0:00

5:45

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

3.956

3.939

15:54

0:00:00

0:00:00

0:00

8:06

0:00:00

24:00

 

Total

23.606

23.397

94:53

0:00:00

24:00:00

0:00

49:07

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

254

Max. Dam Level

1495.40

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

246

Min. Dam Level

1482.85

Wangtoo

1909

9:00

699

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1001

17:00

478

1:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

4

0

Draft Tube

7

1