SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 30.04.10 is 29597.398 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 30.04.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
14.663 |
22.750 |
23.606 |
23.397 |
353.630 |
434.313 |
441.458 |
437.840 |
353.630 |
434.313 |
441.458 |
437.840 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
5.274 |
5.226 |
21:25 |
0:00:00 |
0:00:00 |
0:00 |
2:35 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
5.612 |
5.560 |
22:37 |
0:00:00 |
0:00:00 |
0:00 |
1:23 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
4.123 |
4.075 |
16:42 |
0:00:00 |
0:00:00 |
0:00 |
7:18 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
4.641 |
4.597 |
18:15 |
0:00:00 |
0:00:00 |
0:00 |
5:45 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
0.000 |
0.000 |
0:00 |
0:00:00 |
24:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
3.956 |
3.939 |
15:54 |
0:00:00 |
0:00:00 |
0:00 |
8:06 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
23.606 |
23.397 |
94:53 |
0:00:00 |
24:00:00 |
0:00 |
49:07 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
254 |
Max. Dam Level |
1495.40 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
246 |
Min. Dam Level |
1482.85 |
Wangtoo |
1909 |
9:00 |
699 |
1:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
1001 |
17:00 |
478 |
1:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
4 |
0 | |||||||||||||||
|
Draft Tube |
7 |
1 | |||||||||||||||