SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 06.02.12 is 50851.942 MU (Gross)
Year 2011-2012 

DAILY GENERATION  REPORT FOR 06.02.12

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

6.600

6.059

6.308

6.267

39.600

35.707

35.639

35.374

6487.600

7146.446

7215.571

7149.788

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit #4 has been taken for Annual Maintenance w.e.f. 05/02/12 at 00:00 Hrs due to less availability of water

Unit - 1 

1.869

1.852

7:38

0:00

00:00

0:00

16:22

0:00:00

24:00

Unit - 2 

1.714

1.702

6:59

0:00

00:00

0:00

17:01

0:00:00

24:00

Unit - 3 

0.397

0.393

1:33

0:00

00:00

0:00

22:27

0:00:00

24:00

Unit - 4 

0.000

0.000

0:00

24:00

00:00

0:00

0:00

0:00:00

0:00

Unit - 5 

0.368

0.366

1:27

0:00

00:00

0:00

22:33

0:00:00

24:00

Unit - 6 

1.960

1.954

8:08

0:00

00:00

0:00

15:52

0:00:00

24:00

 

Total

6.308

6.267

25:45

24:00

0:00

0:00

94:15

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

71

Max. Dam Level

1494.00

 Location

Max.

at (Hr.Min)l

Min.

at(Hr.Min)

Water Utilized

66

Min. Dam Level

1483.60

Wangtoo

0

#N/A

0

#N/A

Water Spillage

Max. TRT Level

1005.81

SFT

0

#N/A

0

#N/A

Water utilised for SFT flushing

Min. TRT Level

1001.85

Draft Tube

27

19:00

22

11:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

0

0