SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 10.07.10 is 38908.067 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 10.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.771

37.281

36.938

351.490

367.994

370.706

367.630

2585.108

2772.964

2795.278

2772.093

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.176

6.115

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.256

6.199

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.058

5.996

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.326

6.260

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.211

6.160

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.254

6.208

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.281

36.938

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

891

Max. Dam Level

1495.75

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

388

Min. Dam Level

1491.20

Wangtoo

1730

23:00

1240

12:00

Water Spillage

422

Max. TRT Level

1010.0

SFT

Water utilised for SFT flushing

81

Min. TRT Level

1009.0

Draft Tube

1427

10:00

684

3:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

30

7