SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 11.07.10 is 38945.234 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 11.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.030

37.167

36.858

386.639

405.024

407.873

404.488

2620.257

2809.994

2832.445

2808.951

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.230

6.171

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.278

6.225

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.192

6.137

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.334

6.286

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.834

5.788

23:15

0:00:00

0:45:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.299

6.251

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.167

36.858

143:15

0:00:00

0:45:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

946

Max. Dam Level

1495.75

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

387

Min. Dam Level

1493.00

Wangtoo

1710

7:00

1128

20:00

Water Spillage

478

Max. TRT Level

1010.5

SFT

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

989

13:00

742

18:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

26

6