SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 23.07.10 is 39352.544 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 23.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.839

37.299

36.987

808.424

808.410

815.183

808.400

3042.042

3213.380

3239.755

3212.863

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.230

6.164

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.262

6.215

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.074

6.012

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.286

6.251

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.229

6.165

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.218

6.180

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.299

36.987

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1068

Max. Dam Level

1495.25

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

389

Min. Dam Level

1493.00

Wangtoo

3401

23:00

2284

6:00

Water Spillage

598

Max. TRT Level

1011.5

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

81

Min. TRT Level

1010.5

Draft Tube

1673

21:00

988

7:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

52

6