SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.07.10 is 39390.056 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 24.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

37.270

37.512

37.179

843.572

845.680

852.695

845.579

3077.190

3250.650

3277.267

3250.042

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.259

6.202

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.342

6.299

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.055

5.991

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.352

6.313

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.243

6.167

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.261

6.207

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.512

37.179

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1140

Max. Dam Level

1495.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

391

Min. Dam Level

1494.05

Wangtoo

2965

24:00

2149

6:00

Water Spillage

668

Max. TRT Level

1011.5

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

81

Min. TRT Level

1010.5

Draft Tube

1992

2:00

1214

24:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

56

4