SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 11.03.10 is 35900.816 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 11.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.279

7.454

7.365

70.137

80.399

82.198

81.305

6337.551

6744.493

6805.087

6744.876

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.245

0.242

1:07

0:00:00

0:00:00

0:00

22:53

0:00:00

24:00

Unit - 2 

2.492

2.462

11:13

0:00:00

0:00:00

0:00

12:47

0:00:00

24:00

Unit - 3 

0.140

0.138

0:39

0:00:00

24:00:00

0:00

23:21

0:00:00

0:00

Unit - 4 

0.673

0.664

2:55

0:00:00

0:00:00

0:00

21:05

0:00:00

24:00

Unit - 5 

2.721

2.689

11:44

0:00:00

0:00:00

0:00

12:16

0:00:00

24:00

Unit - 6 

1.183

1.170

4:37

0:00:00

18:45:00

0:00

0:38

0:00:00

5:15

 

Total

7.454

7.365

32:15

0:00:00

18:45:00

0:00

93:00

0:00:00

125:15

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

79

Max. Dam Level

1490.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

78

Min. Dam Level

1479.90

Wangtoo

215

17:00

180

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

55

20:00

55

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0