SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 13.03.10 is 35915.865 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 13.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.403

7.735

7.642

86.251

95.222

97.428

96.354

6353.665

6759.316

6820.317

6759.925

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.532

0.526

2:26

0:00:00

0:00:00

0:00

21:34

0:00:00

24:00

Unit - 2 

2.135

2.109

8:59

0:00:00

0:00:00

0:00

15:01

0:00:00

24:00

Unit - 3 

0.419

0.414

1:49

0:00:00

24:00:00

0:00

22:11

0:00:00

0:00

Unit - 4 

1.131

1.117

5:02

0:00:00

0:00:00

0:00

18:58

0:00:00

24:00

Unit - 5 

3.005

2.969

12:29

0:00:00

0:00:00

0:00

11:31

0:00:00

24:00

Unit - 6 

0.513

0.507

2:14

0:00:00

0:00:00

0:00

21:46

0:00:00

24:00

 

Total

7.735

7.642

32:59

0:00:00

0:00:00

0:00

111:01

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

83

Max. Dam Level

1492.90

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

81

Min. Dam Level

1479.50

Wangtoo

199

17:00

161

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

58

20:00

58

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0