SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 16.03.10 is 35939.998 MU
Year
2009-2010
DAILY GENERATION REPORT FOR 16.03.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
8.057 |
8.043 |
8.675 |
8.572 |
110.422 |
118.912 |
121.850 |
120.487 |
6377.836 |
6783.006 |
6844.739 |
6784.058 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
2.124 |
2.098 |
8:38 |
0:00:00 |
0:00:00 |
0:00 |
15:22 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
1.981 |
1.958 |
8:10 |
0:00:00 |
0:00:00 |
0:00 |
15:50 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.000 |
0.000 |
0:00 |
0:00:00 |
11:30:00 |
0:00 |
12:30 |
0:00:00 |
12:30 | ||||||||
|
Unit - 4 |
0.000 |
0.000 |
0:00 |
0:00:00 |
11:30:00 |
0:00 |
12:30 |
0:00:00 |
12:30 | ||||||||
|
Unit - 5 |
0.593 |
0.586 |
2:37 |
0:00:00 |
0:00:00 |
0:00 |
21:23 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
3.977 |
3.930 |
15:50 |
0:00:00 |
0:00:00 |
0:00 |
8:10 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
8.675 |
8.572 |
35:15 |
0:00:00 |
23:00:00 |
0:00 |
85:45 |
0:00:00 |
121:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
88 |
Max. Dam Level |
1491.70 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
88 |
Min. Dam Level |
1481.40 |
Wangtoo |
231 |
17:00 |
199 |
7:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
0 |
0:00 |
0 |
0:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||