SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 16.03.10 is 35939.998 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 16.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

8.043

8.675

8.572

110.422

118.912

121.850

120.487

6377.836

6783.006

6844.739

6784.058

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.124

2.098

8:38

0:00:00

0:00:00

0:00

15:22

0:00:00

24:00

Unit - 2 

1.981

1.958

8:10

0:00:00

0:00:00

0:00

15:50

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

11:30:00

0:00

12:30

0:00:00

12:30

Unit - 4 

0.000

0.000

0:00

0:00:00

11:30:00

0:00

12:30

0:00:00

12:30

Unit - 5 

0.593

0.586

2:37

0:00:00

0:00:00

0:00

21:23

0:00:00

24:00

Unit - 6 

3.977

3.930

15:50

0:00:00

0:00:00

0:00

8:10

0:00:00

24:00

 

Total

8.675

8.572

35:15

0:00:00

23:00:00

0:00

85:45

0:00:00

121:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

88

Max. Dam Level

1491.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

88

Min. Dam Level

1481.40

Wangtoo

231

17:00

199

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

0

0:00

0

0:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0