SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 19.03.10 is 35966.578 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 19.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

8.923

9.202

9.140

134.593

144.271

148.679

147.067

6402.007

6808.365

6871.568

6810.638

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

4.059

4.032

18:24

0:00:00

0:00:00

0:00

5:36

0:00:00

24:00

Unit - 2 

1.704

1.692

6:58

0:00:00

0:00:00

0:00

17:02

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

0.239

0.237

1:00

0:00:00

0:00:00

0:00

23:00

0:00:00

24:30

Unit - 5 

3.200

3.179

13:16

0:00:00

0:00:00

0:00

10:44

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

9.202

9.140

39:38

0:00:00

0:00:00

0:00

104:22

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

104

Max. Dam Level

1489.40

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

96

Min. Dam Level

1479.35

Wangtoo

793

17:00

316

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

71

20:00

71

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0