NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 21.03.10 is 35989.530 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 21.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

13.481

12.543

12.460

150.896

167.711

171.768

170.019

6418.310

6831.805

6894.657

6833.590

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.204

2.191

10:54

0:00:00

0:00:00

0:00

13:06

0:00:00

24:00

Unit - 2 

4.688

4.656

21:07

0:00:00

0:00:00

0:00

2:53

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

1.184

1.176

5:16

0:00:00

0:00:00

0:00

18:44

0:00:00

24:30

Unit - 5 

2.874

2.853

13:25

0:00:00

0:00:00

0:00

10:35

0:00:00

24:00

Unit - 6 

1.593

1.584

6:39

0:00:00

0:00:00

0:00

17:21

0:00:00

24:00

 

Total

12.543

12.460

57:21

0:00:00

0:00:00

0:00

86:39

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

130

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

131

Min. Dam Level

1483.95

Wangtoo

1017

12:00

588

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

N/A

N/A

N/A

N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0