Total Power
Generated Till Dated 25.03.10 is 36038.929 MU
Year
2009-2010
DAILY GENERATION REPORT FOR 25.03.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
8.246 |
12.390 |
12.209 |
12.144 |
183.880 |
217.363 |
221.509 |
219.418 |
6451.294 |
6881.457 |
6944.398 |
6882.989 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
1.306 |
1.298 |
5:19 |
0:00:00 |
0:00:00 |
0:00 |
18:41 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
3.734 |
3.719 |
16:47 |
0:00:00 |
0:00:00 |
0:00 |
7:13 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.189 |
0.188 |
0:46 |
0:00:00 |
0:00:00 |
0:00 |
23:14 |
0:00:00 |
24:30 | ||||||||
|
Unit - 4 |
3.264 |
3.252 |
13:01 |
0:00:00 |
0:00:00 |
0:00 |
10:59 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
2.326 |
2.302 |
10:11 |
0:00:00 |
0:00:00 |
0:00 |
13:49 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
1.390 |
1.385 |
5:41 |
0:00:00 |
0:00:00 |
0:00 |
18:19 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
12.209 |
12.144 |
51:45 |
0:00:00 |
0:00:00 |
0:00 |
92:15 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
130 |
Max. Dam Level |
1495.00 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
127 |
Min. Dam Level |
1478.45 |
Wangtoo |
438 |
19:00 |
361 |
12:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
117 |
10:00 |
67 |
4:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||