SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 26.03.10 is 36051.351 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 26.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

12.029

12.517

12.422

192.126

229.392

234.026

231.840

6459.540

6893.486

6956.915

6895.411

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.974

1.943

8:22

0:00:00

0:00:00

0:00

15:38

0:00:00

24:00

Unit - 2 

2.973

2.960

12:56

0:00:00

0:00:00

0:00

11:04

0:00:00

24:00

Unit - 3 

0.132

0.131

0:33

0:00:00

0:00:00

0:00

23:27

0:00:00

24:30

Unit - 4 

2.056

2.049

8:25

0:00:00

0:00:00

0:00

15:35

0:00:00

24:30

Unit - 5 

2.536

2.505

11:05

0:00:00

0:00:00

0:00

12:55

0:00:00

24:00

Unit - 6 

2.846

2.834

11:58

0:00:00

0:00:00

0:00

12:02

0:00:00

24:00

 

Total

12.517

12.422

53:19

0:00:00

0:00:00

0:00

90:41

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

136

Max. Dam Level

1495.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

130

Min. Dam Level

1478.55

Wangtoo

445

10:00

380

4:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

117

10:00

67

4:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0